SR 0345/SR 0724 Over Hay Creek


Birdsboro & Berks Counties, PennDOT District 5-0

AEG, as the design consultant to the construction contractor Clearwater Construction, prepared final construction plans for the project. The project involved the replacement of the existing structurally deficient bridge with a single span composite adjacent pre-stressed concrete box beam structure carrying two lanes of traffic and sidewalks on SR 345 & SR 724 over the Hay Creek in Birdsboro Borough, Berks County, PA. The total length of the construction was 730 feet which included the bridge and approach roadway areas. In addition to the bridge and the approach roadway, the construction included storm drainage facilities, temporary and permanent erosion and sediment pollution control features, protection of existing utilities and other minor items. AEG was responsible for the final design and construction plan preparation for all aspects of the project as well as obtaining approval for the environmental permitting and erosion and sediment pollution control plan. AEG also prepared the final ROW plans and MPT plans for the project.