SR 145 Safety Project


SR 145 Safety Project, Whitehall Township, Lehigh County, PennDOT District 5-0

AEG was awarded this project with Muschlitz Excavating, Inc. as the prime contractor in PennDOT District 5-0. This project included the widening and reconstruction of SR 145 to remove the railroad and Lehigh Street overpass structures, construct an at-grade intersection at Lehigh St, install center concrete barrier, islands, turn lanes, and replace the bridge at Municipal Drive with a concrete box culvert and other roadway items including traffic signals, guiderail, drainage, curbing, sidewalk, lighting, signing and pavement markings and other miscellaneous construction for SR 145, Section 08S in Lehigh County, Whitehall Township, from approximately the Eberhart Road intersection at segment 0140 offset 3090 NB and segment 0141 offset 3017 SB to approximately the Church Street intersection at segment 0180 offset 0050 NB and segment 0181 offset 0050 SB for a total approximate length of 6548.45 feet (1.24 miles). AEG provided construction surveying and CPM scheduling services on this project.